Skip To Content
RouteAll

Vermont Oversize Load Signs, Flags And Lights

Sources Reviewed: October 23, 2026

Vermont’s published oversize instructions specify sign triggers for width, height and length, alongside flagging for oversize loads and special instructions for rear or front overhang. A permit-reading review and an equipment review should happen together.

On This Page

When Does Vermont Require The Banner?

CVO-110 lists signs above 8 feet 6 inches wide, 13 feet 6 inches high or 75 feet long. The OVERSIZE LOAD sign is at least 7 feet by 18 inches, yellow with black letters at least 10 inches high and 1¼-inch strokes. It goes on the foremost and rearmost part of the load or vehicle. The document accepts a similar sign allowed by another state; verify that provision against the actual trip rather than assuming any banner qualifies.

Where Do Vermont Flags Go?

The instructions require bright or fluorescent red or orange flags at least 18 inches square. Overwidth loads need at least four corner flags and additional flags where an irregular shape has wider extremities. For overlength or front/rear overhang above 4 feet, one end flag applies below 2 feet wide and two apply at 2 feet wide or more. That exact boundary differs from summaries that merely say a narrow projection.

What Lighting Applies To A Projecting Load?

Vermont directs commercial vehicles to the projecting-load lighting requirements of 49 CFR 393.11, including the cited footnotes. A daylight flag inventory is not the lighting plan. Check the actual projection and planned travel conditions against that standard and the permit. Do not treat an amber lamp purchase as permission to move beyond an allowed window. Ensure attachments and lamp instructions remain legible in the cab.

What Happens When The Move Stops Or Ends?

CVO-110 directs signs to be covered or removed when not making an oversize movement. It also requires identifying contact information on a parked oversize load away from its origin or destination so someone can arrange security or removal. Include the waiting-location handoff in dispatch planning. Equipment readiness does not make a roadside location suitable for parking or authorize a different road to reach it.

How Can RouteAll Help Prepare The Vermont Trip?

Import the issued permit into RouteAll and review its extracted road sequence while parked. Compare the first road, connecting junctions and final approach with the document, then share the reviewed route with the crew. Keep your equipment checklist beside that route review. RouteAll helps organize and navigate the permitted route; it does not inspect banners, certify flag placement or establish that a lighting setup complies with the permit.

Before You Roll

Match the measured load to the permit category. Inspect the actual front, rear and projecting points after securement. Resolve any unclear marking instruction with the issuing authority before dispatch, and revisit it when equipment or the load changes.

Further Reading

Sources And Scope

Original driver reference based on the identified official publications, reviewed October 23, 2026. The issued permit, current law and applicable commercial-vehicle rules control. Load markings and escort equipment are distinct. This page identifies the source scope and does not replace a complete equipment inspection.

Find A Guide

Search The Driver Guide Library.

Browse All Guides

Redacted Permit Example

Historical reading example. Not valid for travel. Pinch or zoom your browser to inspect the fields.