Oversize Permit Turnaround By State

Official Sources Reviewed: November 12, 2026

An oversize permit can issue in minutes when the state’s system self-issues it, as in Oregon, Washington and Pennsylvania. Where a state publishes a time for staff review, it runs from two hours in Alabama and Colorado to three days in Tennessee and New Jersey. Superloads take longest: Tennessee lists 30 days above 500,000 pounds.

On This Page

What Decides How Long A Permit Takes?

The path your application takes decides the wait. States describe three paths:

  • Self-issue or auto-issue: the system checks the load and route and issues the permit at once. Pennsylvania says about 4 of every 5 applications go this way, in about a minute.
  • Staff review: a permit agent or router checks the route. Pennsylvania says the other 1 in 5 is normally reviewed within one full workday.
  • Engineering review: bridge, structural or route-survey checks for heavy or very large loads. This is where waits of days or weeks come from.

Each state draws the lines between those paths differently, and many do not publish them.

How Long Do Permits Take In Tennessee, Georgia, Arkansas, Oklahoma, New Jersey, North Carolina And Oregon?

These seven states come up most often in driver groups. Only Tennessee, New Jersey, North Carolina and Oregon publish a time for routine permits.

What each state publishes about permit timing, in its own words. Retrieved November 12, 2026.
StateRoutine PermitsBridge Review And SuperloadsHours And Portal
Tennessee“May take up to 3 days to process” for single-trip and annual permits. Pre-defined TNTRIPS routes process fastest; an entered route goes to a permit agent.Over 165,000 lb needs Structures Division approval. Superloads take about 3 days up to 165,000 lb, 5 days to 250,000, 15 days to 500,000 and 30 days above. A route survey is required over 15 ft 6 in high or 16 ft wide.Mon–Fri 8:00–4:30, closed 12–1. TNTRIPS
GeorgiaNo time published for a Standard Single permit (to 16 ft and 150,000 lb). A router reviews loads over 12 ft wide, 13 ft 6 in high, 100 ft long or 100,000 lb.Superload Single (over 16 ft, 150,001–180,000 lb): up to 3 days. Superload Plus (over 180,000 lb, bridge analysis): up to 3 weeks. Mega Load (300,000 lb and up): at least 30 business days after the engineering submittal.Mon–Fri 8:30–4:30. GAPROS
ArkansasNo time published. Some permits are available through ARPARS any hour of the year.Superload: 180,000 lb or more, over 16 ft 6 in wide, 100 ft or longer, or 15 ft 6 in or higher. The rules say to apply “far enough in advance” for engineering exams, with no number.Staffed 6:00 a.m.–4:30 p.m. Mon–Fri. We could not confirm the portal address from the state’s site; check with the state.
OklahomaNo time published for oversize-only permits. Overweight requests go through the automated system.Overweight requests must arrive at least 5 working days before the move, with more time when several bridges are involved. An unstudied superload route needs a structural analysis. A Highway Patrol escort contract can take 2 to 4 weeks.Oklahoma City office 8:00–12:00 and 1:00–4:00. OkiePROS
New JerseySome permits are system-issued; NJDOT does not publish the limits. Staff review: allow up to 3 business days, normally 1.Bridge Engineer review typically takes 12 to 48 business hours. A route survey is required over 16 ft wide or 14 ft 6 in high.Support 7:00–3:30 ET; bridge questions 8:00–5:00 ET. NJ permit portal
North CarolinaSame working day if received by 3:00 p.m. Eastern; after 3:00, next working day. Over 14 ft high: allow 2 working days.Superload (over 132,000 lb or over 15 ft wide, among other triggers): at least 10 working days before the move. Wait 16 working hours before asking for status.Call-in 7:00–4:00 Mon–Fri. PIMS
OregonODOT says routine permits issue “within minutes” in ORION, and 45% of single-trip permits were self-issued in its first year. The state license directory lists 1–3 days.Superloads can take up to 10 days. Superload: over 16 ft wide on Interstate and multi-lane highways, over 14 ft on two-lane, over 17 ft high, or over 150 ft long.Mon–Fri 7:00–5:00 Pacific; closed Wednesdays 12–1. ORION

Office hours are local time unless the state names a zone. Georgia, Arkansas and Oklahoma do not state one.

What Do Other States Publish?

Twenty more states publish a processing time, a lead time or a self-issue limit. The rest of the states we checked publish none.

Other states’ published permit timing. Retrieved November 12, 2026.
StateWhat The State Publishes
AlabamaSingle-trip permits: a two-hour turnaround. Annual permits: up to 10 business days. Free-form routes need office review. Mon–Fri 7:00–4:45 Central.
CaliforniaVariance permits (over 15 ft wide, 17 ft high or 135 ft long): submit no later than 30 days ahead. No routine time published. Office 8:00–5:00 Mon–Fri.
ColoradoSingle-trip permits: a two-hour turnaround; after 3 p.m. Mountain, same day is not guaranteed. Chapter 6 Specials: 3–5 business days, but CDOT warns of 2–3 weeks while the Bridge section is short-staffed.
FloridaTrip permits self-issue in PAS up to 16 ft wide, 18 ft high, 150 ft long and 200,000 lb (140,000 lb self-propelled). No time published above that. Office 8:00–5:00 Mon–Fri.
IdahoBridge analysis: up to 3 business days to 250,000 lb, 10 business days above. Approval for the largest dimensions: up to 24 working hours.
Illinois“Most permits are immediately issued.” Permits that are not auto-issued are processed 7:00–4:30 Mon–Fri.
IndianaMost requests are approved within a business day. A predetermined route that fits the load is approved automatically. Mon–Fri 8:00–4:30 Eastern.
LouisianaCurrent notice: superloads may take 6–8 weeks and route approvals 2–4 business days because of higher volume. Over 232,000 lb: request 4–6 weeks ahead. Manual-review permits issue only in office hours, 7:00–3:30.
MichiganElectronic single-trip permits: usually within 12 business hours. Extended permits: 15–21 business days. The state auditor measured about 1 hour on average (October 2023–March 2025).
MissouriReceived by 5 p.m. Central: processed the same business day, usually within 60 minutes. Superloads (over 16 ft wide or high, 150 ft long or 160,000 lb): about two weeks.
MontanaSuperload Class 1: decided within two working days of a complete application. Class 2: within five working days. Mon–Fri 8:00–5:00 Mountain.
New YorkSuperload (over 16 ft wide, 16 ft high or more, over 160 ft, or 200,000 lb or more): a more intensive review. No processing time published. Calls are returned within 1 business day.
PennsylvaniaAbout 4 of 5 APRAS applications are processed automatically in about a minute; the rest are normally reviewed within one full workday. Superloads (over 201,000 lb, 160 ft or 16 ft wide) are never auto-issued; start review at least three weeks ahead.
South CarolinaSuperloads (over 130,000 lb, or any single axle over 20,000 lb): 3–5 business days. Over 16 ft wide: two days for county contact. Multi-trip permits auto-issue 24/7 up to 14 ft wide, 13 ft 6 in high and 100,000 lb on five axles or more.
TexasSuperheavy permits: apply through TxPROS three to four weeks ahead unless an approved route is on file. Office 8:00–4:30 Mon–Fri.
UtahOver 17 ft 6 in high, 17 ft wide or 300,000 lb: processed weekdays 8–5 Mountain only, up to 14 days. Loads needing regional authorization: allow up to 14 days.
VirginiaEZ Haul issues “most hauling permits in one day or less,” and some self-issue. Superloads: submit at least 10 working days ahead.
WashingtonMost routine permits self-issue online 24/7, up to 16 ft wide, 16 ft high, 125 ft load length and 200,000 lb. Over 16 ft: apply 7 calendar days ahead in writing; over 200,000 lb: 30 days.
West VirginiaSelf-issued permits: typically a few minutes. Manual review: normally within 24 hours. Superloads: a minimum of 48 hours or more.
WisconsinMailed applications: a minimum 10-day turnaround. Single-trip permits may be requested five days ahead.

Mississippi, Ohio, Kansas, Kentucky, Maryland, Minnesota, Wyoming, Iowa and Nebraska publish no current processing time on the pages we could read. Iowa links a live processing-time sheet that we could not open. We could not confirm Arizona’s times from the state’s site, and we did not review the other 13 states. Check with the state for any of these.

What Sends A Permit To Bridge Review?

Weight is the usual trigger, but axle weight and spacing can trigger it below the headline number. Tennessee says bridge analysis depends on “total weight, axle weight, and axle spacing.” It adds that padded weights can send an application to bridge analysis that the real weights would not.

  • Tennessee: over 165,000 lb needs Structures Division approval.
  • Georgia: over 180,000 lb requires bridge analysis.
  • South Carolina: over 130,000 lb, or any single axle over 20,000 lb.
  • New Jersey: the limits for system issue exist but are not published.
  • West Virginia: failing the automated clearance check sends it to District bridge staff.

Warning: Do not pad axle weights to be safe. Enter the real weights; padding can trigger a bridge review the load does not need.

Why Is My Permit Taking Longer Than The State Says?

States name these causes on their own pages:

  • A custom route: Tennessee and Alabama send entered or free-form routes to staff.
  • A late application: North Carolina’s cut-off is 3:00 p.m. Eastern; Colorado does not guarantee same day after 3 p.m. Mountain.
  • Office hours: Louisiana, Michigan and Illinois process manual permits only in business hours.
  • Volume: Louisiana and Colorado have posted notices about longer superload times.
  • A resubmission: Tennessee re-evaluates every resubmission after a failed bridge analysis.

When a permit sits past the state’s published time, call the permit office with your application number.

Where Does RouteAll Fit?

RouteAll does not apply for permits or speed up a state’s review. When the permit arrives, RouteAll reads the route it names and gives turn-by-turn directions on those roads, so you can start the move without typing the route into a GPS.

Before You Roll

Plan on the state’s published lead time, not the fastest case, and add more for superloads and bridge review. Check the permit’s start date and route as soon as it issues.

Common Questions

How long does a Tennessee oversize permit take?

TDOT says regular single-trip and annual permits may take up to 3 days to process. Superloads take about 3 days up to 165,000 pounds, 5 days to 250,000, 15 days to 500,000 and 30 days above. Pre-defined TNTRIPS routes process fastest. Checked November 12, 2026.

How long does a North Carolina superload permit take?

NCDOT asks for superload applications at least 10 working days before the move, and asks you to wait 16 working hours before checking status. A superload in North Carolina includes loads over 132,000 pounds or over 15 feet wide.

Which states take more than a day for oversize permits?

States that publish longer times include Tennessee (up to 3 days for routine permits), New Jersey (up to 3 business days for staff review) and Oregon (1 to 3 days in its license directory). Superloads take longer almost everywhere, from 48 hours in West Virginia to 6 to 8 weeks in Louisiana.

Further Reading

Sources And Scope

Every time on this page is the state’s own published figure, from its permit office, rules or official notices. We did not estimate any time. A state’s published time is a target, not a guarantee, and states change them without notice.